SMPE Installation
Place of installation: 51000 Vitry le François.
Project:
Suction and filtration of the oil mist installation on the emanation of polluting a tube boots oil quench tank up to 20 meters in length.
Issue:
The length of the vessel being 21 meters and a width of 1500 meters, the sensing difficulty was to have a regular suction efficiency over the entire length of the tank.
Solutions:
The project was completed with the implementation of specific sensors ensuring constant suction velocity along their length. The installation was carried out by our specialized teams without stopping business activity. The sensors have been equipped with reinforcements to prevent deformation during handling tubes boots with hoists.
Plant performance:
- Suction rate: 22500 m3/h
- Fan power output: 30 kw
Additional information
For a custom installation,
please use our quote form.